800kW Rooftop Solar for Rice Mills: The Hemraj Rice Mill Case Study

800kW Rooftop Solar for Rice Mills: The Hemraj Rice Mill Case Study

Location: Katwa, Purba Bardhaman, West Bengal Industry: Rice Milling & Food Processing System Size: 800 kW Rooftop Solar EPC Partner: SolarLogix Private Limited, Authorised EPC Channel Partner of TATA Power Solar

Rice mills are among the most power-hungry operations in West Bengal’s agro-industrial belt, running hullers, polishers, and dryers on near-continuous cycles. For any rice mill owner researching rooftop solar for rice mills, the Hemraj Rice Mill project in Katwa is one of the clearest real-world proof points available in the state: an 800kW rooftop solar system delivering measurable savings, without a single day of production downtime.

Rice mills and food processing units are also flagged by national renewable-energy planners as one of the priority MSME segments for rooftop solar adoption, given how energy-intensive the sector is. Hemraj Rice Mill’s project shows exactly what that looks like when executed well.

Why This Project Matters: A Real Rice Mill, Real Numbers

Most “solar for rice mills” content online is theoretical — load-profile guides and generic payback formulas. This is different: a commissioned, operating industrial solar EPC project in Katwa, West Bengal, with verified performance data.

Metric Value
Installed Capacity 800 kW
Daily Generation 2,848 units
Annual Savings ₹88,35,920
Return on Investment 29.08%
Payback Period 3.44 years

A solar payback period under three and a half years, with a near-30% annualized ROI, is the kind of number that turns a “someday” project into an approved capital expenditure line.

The Engineering Challenge: Fitting Solar to a Working Mill Roof

Three problems had to be solved before a single panel went up:

  1. A facility-specific rooftop layout. Hemraj Rice Mill’s roof structure didn’t suit an off-the-shelf mounting kit — it needed engineering built around the building’s actual structural characteristics.
  2. Zero tolerance for downtime. As an active food processing facility, the mill couldn’t pause operations for installation.
  3. A defensible financial case. At 800kW, mill ownership needed hard numbers before signing off — not assumptions.
Hemraj Ricemill 800kW

The Solution: Customized GI Sheet Rooftop Structure

SolarLogix’s answer was a customized GI sheet rooftop structure with tailored fabrication, engineered specifically for Hemraj Rice Mill’s facility layout — not a generic mounting system forced onto a non-standard roof.

This reflects how SolarLogix approaches every industrial solar EPC West Bengal project: treating solar as an engineering system — accounting for structure, space, load behavior, and long-term operations before installation begins, not after problems appear on-site.

The result:

  • Seamless integration with the mill’s existing infrastructure
  • No disruption to ongoing rice milling operations during installation
  • Fabrication built to perform under the roof’s real-world constraints — dust, heat, and monsoon load include
Hemraj Ricemill 800kW

Real-World Performance: Live Monitoring Portal Data

Projected numbers are one thing — actual, live-monitored performance years into operation is what really proves a system out. Hemraj Rice Mill’s plant has been running since June 2023, and its performance is tracked continuously through Tata Power’s remote monitoring portal.

Hemraj Rice Mill 800kW Portal

Plant details on record:

Detail Value
Plant AC Capacity 800 kW
Plant DC Capacity 800 kWp
Location Katwa, West Bengal – 713130
Commissioned By Tata Power Co. Ltd
Commissioning Date 12 June 2023
Total Inverters 8
Total LT Mains 1
Total DG Sets 1

Cumulative gains since commissioning:

Metric Value
Revenue Gains ₹60.5 Lacs
CO₂ Reduction 1.6 mn Tons
Coal Saved 554.9 KTons
Equivalent Trees Planted 75,141.8

For a sense of day-to-day output, the plant’s daily energy log for a sample stretch in March 2026 shows generation consistently in the range of roughly 1,300 to 2,850 units a day across its 8 inverters — in line with the output levels the system was designed for, nearly three years after commissioning. That kind of sustained, monitored performance is the real test of whether a custom-engineered rooftop system holds up under actual mill operating conditions — not just on paper.

Environmental Impact

Beyond the balance sheet, the system delivers a measurable sustainability footprint:

  • 16,593.76 metric tons of CO₂ offset annually — equivalent to roughly 19,480 acres of forest
  • 8,229.52 metric tons of coal burn avoided — comparable to planting over 2.7 lakh trees
  • Over 70 lakh liters of petrol consumption avoided — equivalent to more than 6.5 crore kilometers of driving offset

(These environmental figures are annualized project estimates; the cumulative monitoring portal data above reflects actual performance recorded since the plant’s June 2023 commissioning.)

read more about Hemraj Rice Mill

What Other Rice Mills and Food Processing Units Can Take From This

  • A non-standard roof isn’t a dealbreaker. Custom structural engineering, not a generic mounting kit, is what makes solar work on older or irregular industrial roofs.
  • Installation doesn’t require downtime. With the right fabrication approach, solar can go up on a live production facility.
  • Large systems can still pay back fast. An 800kW installation with a 3.44-year payback proves scale doesn’t have to mean a slower return.

Frequently Asked Questions

What is the daily and annual performance of the Hemraj Rice Mill solar system? The 800kW rooftop system generates approximately 2,848 units daily, translating into estimated annual savings of ₹88,35,920, a 29.08% ROI, and a 3.44-year payback period.

What kind of rooftop structure was used for this rice mill solar installation? A customized GI sheet rooftop structure with tailored fabrication, engineered specifically for Hemraj Rice Mill’s facility layout and existing infrastructure.

Does installing rooftop solar disrupt a rice mill’s operations? No. The tailored fabrication approach at Hemraj Rice Mill was designed for seamless integration with existing infrastructure, so installation proceeded without disrupting day-to-day milling operations.

Who installed the solar system at Hemraj Rice Mill? SolarLogix, an Authorized EPC Channel Partner of TATA Power Solar, designed and commissioned the project in Katwa, West Bengal.

Is the Hemraj Rice Mill solar system still performing well years after installation? Yes. Commissioned in June 2023, the plant is tracked continuously via Tata Power’s remote monitoring portal, which shows cumulative revenue gains of ₹60.5 lacs and consistent daily generation nearly three years into operation — real, monitored performance rather than projections alone.

How much can a rice mill save with rooftop solar in West Bengal? Results vary by mill size and roof area, but at Hemraj Rice Mill, an 800kW system delivered close to ₹88.4 lakh in annual savings with a payback period of under 3.5 years — figures that make the case for solar as an operational cost-cutting investment for energy-intensive rice mills.


Considering rooftop solar for your rice mill or food processing facility? Book a consultation with SolarLogix, Authorized EPC Channel Partner of TATA Power Solar, and see what a custom-engineered system could look like on your roof.

Connect With Us

Talk to Our Team: +91 833 788 7888  |  contact@solarlogix.in

Post Tags :

Facebook
LinkedIn
WhatsApp

Our team is ready to assist you with all your solar energy needs. Whether you want a free consultation, need assistance with a solar installation project, or have any questions about our services, feel free to contact us

Leave a Reply

Your email address will not be published. Required fields are marked *

About Us

At SolarLogix, we pride ourselves on delivering custom solar power solutions for businesses, industries, and institutions across India. Our expertise spans across sectors such as manufacturing, agriculture, education, and commercial spaces, with each project delivering significant cost savings, energy independence, and a reduced carbon footprint.

Get in touch with solarlogix

Newsletter

Explore Tata Power Solar Products with SolarLogix

Become a Solar Champion

Become a Solar Champion with SolarLogix

Join the SolarLogix Campaign and earn exciting vouchers from Tata Power with every successful referral. By spreading the word about sustainable energy, you can make a difference and get rewarded at the same time.

Avail Government Subsidies with PM Surya Ghar Yojna

PM Surya Ghar Yojna

SolarLogix supports the government’s initiative to make solar energy accessible to every household through the PM Surya Ghar Yojna. With attractive subsidies and benefits, switching to solar has never been more affordable.